Home
Our Contact Information
Email Us
Industrial and Commercial
Process Engineering
Control Panels
Air Conditioning Systems
Air Handling Units
Energy Management
Domestic Installations
Emergency Services
Thermographic Inspections
Steam
Boilers And Burners
Design and Sales
Carbon Trust Loans
Tax Dodging
Health and Safety
Latest News
Newsletters
Links
Accreditation
References
Sponsorship
 


April 2013

Pre season annual servicing is carried out by Saunders for Butlins-Bourne leisure at Bognor Regis.

Replacement pressurisation plant is installed at Hilton Hotel at Avisford.


March 2013

Portsmouth Navel Base Property Trust
place an order for replacement commercial boiler plant.


March 2012

Sussex University extend the program for replacement boiler plant and heating upgrades at the East Slpoe accomodation area.

Replacement boiler plant is installed for Alpha Flight Services at Luton Airport.

Replacement AC & Chillers are installed by Saunders at the Hilton Hotel Avisford.


February 2012

Replacement hot water generation is installed by Saunders for the Portsmouth Navel Trust in the Historic Dockyard.

A major commercial gas installation is installed by Saunders for the Sun & Moon refurbishment for Butlins Bourne Leisure at Bognor Regis.

Celebrating the 200th anniversary of the Gold Cup, Saunders carry out a major M&E refurbishment at Goodwood Racecourse


January 2012

Annual steam boiler inspections are undertaken by saunders for LSG Sky Chef at Gatwick.

Saunders carry out annual servicing for Chetsnut Tree House Childrens Hospice near Arundel.

Saunders get in the swing at Wickwood Country Club with servicing and hetaing work.


December 2011

Brighton University award Saunders the contract to install new Air Handling Equipment at the Huxley building.

Periodic Electrical Inspection and Testing
gets underway at Bedales School for the third consecutive year.

Work gets underway at The Body Shop International HQ for additional security facilities.


November 2011

New MHS boiler plant is installed for the Hilton Hotel at Avisford to replace aging equipment.

The installation of new Powrmatic oil fired heaters is completed at Frensham Garden Centre alongside a new oil tank and pressurised pipe network.

Work continues at TEVA UK at Eastbourne with alterations to heating, ductwork and cooling coils.


October 2011

Saunders mechanical and electrical engineers bring another sucessful horse race season at Goodwood to a close for the year.

Additional electrical distribution upgrades are carried out for farnborough college following on from work earlier in the year.


September 2011

Saunders engineers take a 'step back in time' at the Goodwood Revival Meeting. A full refurbishment of the lighting in the Earls Court Motor Show is completed with Art Deco light fitting made by Model tec Studios.

New high performance MHS boilers are installed for Summerlea School in West Sussex.

New gas service and gas safety proving is installed for Butlins at Bognor Regis and wins major refurbishment works.


August 2011

Saunders commence work to install new LPG hot water and heating boilers manufactured by Potterton at Goodwood Park Hotel to replace failing oil fired plant.

Saunders commence the installation of a new commercial gas network at Shoreham Academy.

AM Southern place an order to install replacement boiler plant for RBS in Hampshire.


July 2011

Major commerial gas work gets underway at Hillbrow for Brighton University.

For the 18th consecutive year Saunders engineers carry out the installation of the temporary power generation and supplies for the Goodwood Festival of Speed.

Replacement boiler plant is installed for the Lydhurst Estate.


June 2011

Sussex University place an order for 57 Vaillant condense boilers for the East Slope student accomodation area.

Saunders carry out major upgrading to gas services at Littlehampton Academy in West Sussex.

Work gets underway at Goodwood Racecourse for a mojor refurbishment in the Lennox Enclosure.


May 2011

Lavestoke Park Farm in Hampshire place an order with Saunders for annual commercial and domestic boiler and steam plant.

Slindon College award Saunders the annual servicing contract for their commercial heating plant.

The Hilton Hotel group place an order for replacement air conditioning equipment for their Avisford Hotel.


April 2011

Saunders install replacement welding heating pipework at Lewes Prison in East Sussex.

Annual Peridoc Electrical Inspection and testing is carried out for The Cowdray Trust in Midhurst.

Replacement energy efficient lighting is installed foor The Body Shop International at their headquarters in West Sussex.


March 2011

New MHS boiler plant is installed by Saunders for the Hilton Hotel group in West Sussex.

Replacement Potterton heating equipment is installed at the Bradbury Hotel near Worthing.

Replacement electrical distribution and hetaing control panels are installed at the Congress Theatre, Eastbourne.


February 2011

Saunders
carry out annual servicing for the Chestnut Tree House near Arundel.

Saunders undertake annual M & E work for Farnham Castle.

Urgent repiar work is carried out of failed air handling equipment for Eastbourne Theatres.


January 2011

Replacement oil tank installed at Royal Nuffield Hospital in Hampshire.

New Potterton Paramount boilers are installed by Saunders at Fishbourne Roman Palace.

Annual servicing
gets underway at Butlins in West Sussex.


December 2010

Work gets underway with a major low-energy lighting refrbishment for GAE Searle at Fareham with fittings manufactured by Wirefield, supplied by WF Electrical Wholsalers Portsmouth Branch.

Nuffield Hospital place an order for replacemnt oil tanks at Chandlers Ford, Hampshire.

Bedales School place an order for periodic electrical inspection and testing for their student accommodation areas.


November 2010

Periodic electrical inspection and testing is completed at JCC Lighting head office in West Sussex.

Annual portable appliance testing is complated for the Cowdray Heritage Trust at Midhurst.

Country Homes & Gardens place orders for replacement Powrmatic heaters and annual servicing for all of their garden centres in the South of England

Saunders
carry out servicing to many Air conditioning units for the NHS in Chichester, West Sussex.


October 2010

Replacement warm air heating is installed at Portsmouth Historic Dockyard.

Saunders engineers gat to 'play a-round' with Broag boilers at the prestigious Kennels Golf Club at Goodwood.

Repair work is carried out on Keston boilers plant for Farnham Castle in Hampshire.


September 2010

Annual servicing is underway fro Notre Dame School at Byfleet for their oil and gas boiler and hot water equipment.

Saunders complete the installation of replacement MEM distribution boards for Farmborough College.

Cosham Community Centre place an order to carry out repair work to their gas fried heating installation.


August 2010

Sussex University award Saunders the contract to replace electrical distribution boards in their accomodation areas.

Annual servicing gets underway for oil and gas fired boiler plant at Borde Hill Gardens.

Saunders install hot wtaer equipment for Nyetimber Winery at their new Crawley facility.

Emergency gas repairs are carried out for Sainsbury's at their Basingstoke distribution warehouse.


July 2010

LSG Skychef order replacement Hamworthy hot water boilers for their Crawley facility.

Replacement swimming pool boiler plant is installed for Lakeside Holiday Park at Chichester.


June 2010

Eastbourne Borough Council award Saunders the service contract for the Congress Devonshire and Winter Garden Theatres.

Work gets underway for additonal gas safety equipment at Crawley for Alpha Flight Services.

Emergency Lighting
is updated in the Oliver theatre for Bedales School near Petersfield.


May 2010

New gas safety interlock equipment is installed for Alpha Flight services at Heathrow Airport.

Additional air handling ductwork is insatlled for TEVA UK at their Eastbourne facility.


April 2010

Saunders Specialised Services have been awarded the electrical contract by Goodwood for their Vintage at Goodwood event this year.

Farnborough College have awarded Saunders Specialised Servcies a major contract to replace dated electrical distribution with the new range of MEM 3 distribution equipment.

Saunders are presented with an electrical contract for The Quays.

Alternated Archive lighting has been installed by Saunders at The Body Shop International premises in West Sussex.


March 2010

Installation of new gas safety interlock equipment gets underway for Alpha Flight at Heathrow Airport.

Pre season servicing is carried out for Bourne Leisure at Butlins World Bognor Regis.

Saunders carry out commissions to air handling equipment for building suppliers Wicks at Christchurch.


February 2010

SSD Drives place an order for energy efficient replacement  Potterton heater and boiler plant.

Sussex University place orders for new Derwent Boilers and air handling equipment.

Country Gardens place an order for four Ambirad warm air heaters at their Hereford site.


January 2010

Alpha Flight group award Saunders the service contract for Luton and Stanstead Airports.

Saunders complete the installation of replacement low energy lighting funded by a Carbon Trust Loan.


December 2009

Alpha Flight award Saunders the contract to replace the gas network at their Crawley facility.

Farnham Castle appont Saunders to install replacement heating controls in their prestigeous apartments.

November 2009

WE HAVE MOVED!
We are pleased to announce that due to the expansion of our company we have now relocated to -

Unit 7 Minster Court
Courtwick Lane
Littlehampton
BN17 7RN

Congratulations go to Mr.B.Chambers from West Sussex who is the lucky winner of our latest iPod competition.

Replacment underground pipe by UPINOR is installed for The Hilton Hotel group.

Work begins at Butlins Bourne leisure to install a replacement 1500kw Powrmatic warm air heater.

Energy saving optimising control equipment is installed at Bradford house, epsom for AM Southern.

JCC lighting
upgrade their office boiler plant with a new energy saving condence boiler.


October 2009

Replacement boiler plant is installed at Hilton Hotel Avisford, manufactured by Ideal.

Ten Fujitsu heat pumps are installed for clockaudio in Hampshire.

Annual servicing is carried out on Ambirad heaters for Londons leading architectural glazing company Cantifix.

Replacement extraction plant is installed for Eastbourne theatres.

Daikin Air Conditioning is installed for CIRRUS LASER.


September 2009

Rossetts Commercial Mercedes Dealership renew their annual service contract for their heating equipment.

Annual service work gets underway for Butlins Bourne Leisure at South Coast World.

Saunders complete the installation of 8 replacement commercial boilers and controls at Varley Hall for Brighton University.


August 2009

Annual servicing is carried out for Bedales School, Dorset House and Highfield School.

The Comfort Hotel at Arundel awards Saunders a new servicing and maintenance contract for their heating equipment.

Broughtons of Surrey and the Bentley Dealership renew their annual service contract for their boilers, heating and Daikin air conditioning equipment. 


July 2009

Saunders complete another successful event at the Goodwood Festival Of Speed, installing over 50 generators and distribution for the event, including support for race teams Mclaren, Prodrive, Audi and Ginetta, amoungst many others.

Prebendal School, Chichester awards Saunders a bi-annual service contract for gas and eletrical catering servicing.

Chatsworth Hotel, Worthing place an order with Saunders to install 800kW of replacement MHS boiler plant and 7 high recovery MHS calorifiers. The new equipment will support the Chatsworth Hotel exceptional forwards approach for a greener enviroment.


June 2009

Daikin air conditioning is installed for Brighton University, East Sussex.

Replacement Oil Fired Ideal Boilers and high recovery calorifiers are installed at Goodwood Park Hotel, West Sussex.

Annual servicing is carried out for Royal Grammar Schools at Guildford, Surrey.


May 2009

Replacement energy efficient Worcester boiler plant is installed at Ditcham Park School.

Saunders welcome aboard Alpha Flight Services at Luton Airport. Annual servicing to natural gas and LPG boilers and heating equipment.

Servicing is carried out for Royal Grammar School at Guildford, Surrey.


April 2009

Saunders registered with the GAS safe scheme.

New heating is installed at Queenwood fort he University of Brighton.

Once again Saunders sponcer this years Scum Run - A charity rally raising over £50,000

Work starts on the installation of replacement gas fired warm air heaters for Portsmouth Naval Trust.


March 2009

Replacement Powrmatic warm air heating is installed for Taj Tyres at Southampton.

Annual gas servicing is carried out at Butlins Bognor Regis in Preperation for the frothcoming holiday season.


February 2009

Work gets underway for London based Cosmo Building Services to install Roberts Gordon gas fired warm air heating to four warehouses in Littlehampton.

Replacement oil fired Powrmatic heating is installed for Witley Engineering in Billingshurst.

Replacement LPG gas pipe work, gas safety devices and extract fan interlock is installed in the State Apartments kitchens for The Goodwood Estate in West Sussex.

New gas fired warm air heating manufactured by Ambirad is installed for Kinetrol at their Farnham facility.

Richard Devo is appointed the new Health & Safety Officer of Saunders Specialised Services. Richard has over 30 years experience working in the Construction industry and is warmly welcomed.

Saunders registers with the CHAS scheme ( Contractors Health & Safety Scheme)

Annual Servicing gets under way for the Garrick Club in London and the Avis Cars at Heathrow airport.

The Winner of our 'win an ipod touch' competition is V.Ardley of Hampshire.


January 2009

Portsmouth City Council award Saunders the contract to install replacment gas fired radiant heating in fratton community centre.

Goodwood Road Racing Company renew the contract with Saunders to provide all electrical services for the Festival Of Speed and Goodwood Revival events until 2011.

Work to upgrade AC equipment of London based Level Properties gets underway in their office block in Camden Town.


December 2008

Preperations are made for the renewal of hot water generation equipment for Alfa Flight Services.

Preperations are made for the installation of high efficiency Stokvis boilers at Farnham Castle.

Saunders Specialised Services are listed on the SAFEcontractor scheme.


November 2008

Saunders Specialised Services are pleased to announce they have been awarded the annual service and maintenance contract for Saywell International for 2008/2009.

Major gas servicing gets underway in Porchester for BVT Surface Fleet.


October 2008

Replacement fuel efficient condense boilers are installed at Christ Church Surbiton.

Annual thermographic image inspections are completed for The Body Shop International.


September 2008

Saunders Specialised Services celebrate their 10th consecutive year working at the historic  Goodwood Revival Meeting.

Work continues at Bedales School with the installation of high efficency boilers and hot water generation equipment.


August 2008

Work starts on the major refurbishment of the M&E services in the orthodontic ward at Royal Surrey County Hospital, Guildford.

Saunders Specialised Services install Daikin air conditioning for the new IT server room serving all of the Goodwood Estate.


July 2008

Saunders are on hand once again to install temperary generators and power supplies for the world renowned Goodwood Festival of Speed.

Work continues at Brighton University for the installation of major heating plant and equipment.


June 2008

Work gets underway at the Goodwood Motor Circuit for their replication of the art deco designed Earls Court motor fair.

Work continues at Butlins, Bognor Regis, for the annual servicing for their gas fired equipment.